Tri-Area Wastewater Chlorination System

All Pictures are Thumbnails, Click on them to expand them.

 TAWW01.JPG (21466 bytes)             TAWW02.JPG (232877 bytes)
Pump Filter / Pre-Screen
Stainless Steel and PVC
TAWW03.JPG (259040 bytes)      TAWW04.JPG (236926 bytes)
Stainless Steel Pump &
Pump Inside Pre-Screen

TAWW07.JPG (262808 bytes)
PVC Panel w/ Gauges and Ejector
w/ Service Unions
TAWW05.JPG (178977 bytes)         TAWW12.JPG (239935 bytes)
Stainless Steel Pump &
Pump Inside Pre-Screen
TAWW14.JPG (187026 bytes)
PVC Panel Installed and Piped
TAWW13.JPG (170515 bytes)
PVC Panel Installed and Piped
TAWW09.JPG (197536 bytes)
Empty Chlorine Bottle Storage
TAWW10.JPG (173710 bytes)
Full & In-Use Chlorine Bottles
TAWW08.JPG (193966 bytes)
Empty Chlorine Bottle Storage
TAWW11.JPG (192429 bytes)
Full Chlorine Bottle Storage
TAWW15.JPG (308846 bytes)
Installed Pump w/ Flex PVC
TAWW16.JPG (268645 bytes)
Installed Pump w/ Flex PVC
TAWW19.JPG (316075 bytes)
Pipe and Electrical
Entrance to Manhol
e
TAWW18.JPG (206870 bytes)
Pipe Entrance to Building
TAWW17.JPG (263197 bytes)
Trench from Manhole to Building