Rocky Ford Water Plant
Cl2 System Start-Up
November 4, 2010 

Click on Picture To Enlarge.

 
 
 
 
 

Rocky Ford Water Plant
Cl2 System Start-Up
Follow-Up w/ Ejector Piping Changes
 + Force Flow Board Exchange

November 16, 2010 

 


Boards Replaced - Unit working.
Prior to tare adj.
|
Clearwell Ejector Nozzle .159

U V Ejector Nozzle .185
Simultaneous Operation   Post UV   Clearwell  
Booster Pump Discharge (PSIG)     90  
Ejector Supply Pressure   90   60  
Ejector Back Pressure   54   2.5  
Flow Rate after the Ejector (GPM) Need to    2.63  
        confirm      
               
Independent Operation   Post UV   Clearwell  
Booster Pump Discharge (PSIG)     120  
Ejector Supply Pressure   100   65  
Ejector Back Pressure   55   3  
Flow Rate after the Ejector (GPM) 5.26   2.69  
               
               
Suction Pressure to the Booster Pump (PSIG) 38      

 

 

Updated - November 16, 2010 